Rocky Mountain Construction

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

Nevada Transportation Board Approves Two-Year Contract to Repave/Improve State Routes 28 and 431 Near Incline Village

CARSON CITY, NV — The Nevada State Board of Transportation recently approved a contract for a two-year Nevada Department of Transportation project to repave and enhance nearly 15 miles of State Routes 28 and 431 centered around Incline Village.

Contractor Q&D Construction was selected as contractor for the approximately $35-million, two-year project to repave and improve the mountainous highways which were last fully reconstructed nearly 14 years ago. As many as 10,000 drivers travel the highways every day. The following project improvements will be made:

State Route 28 from Nevada/California Border to South of Sand Harbor State Park
  • Four inches of roadway asphalt will be removed and replaced from Nevada/California border to Ponderosa Ranch Road in southern Incline Village.
  • Select roadway cross slopes will be reconstructed for enhanced roadway alignment and drainage.
  • Drainage and guardrail improvements will enhance roadside safety and water quality, ensuring additional stormwater treatment before reaching Lake Tahoe.
  • Enhanced sidewalks, sidewalk ramps, and driveway accesses will provide additional connectivity, accessibility, and safety.
  • An aging timber retaining wall on State Route 28 near Memorial Point lookout will be reinforced with a soil nail wall. Anchor bars and “shotcrete” concrete will create the soil nail wall to help reinforce against age-related settlement.
  • Drainage improvements will be made where Marlette Creek crosses underneath SR 28, enhancing water quality and ensuring additional stormwater treatment before reaching Lake Tahoe
State Route 431 from State Route 28 Roundabout in Incline Village to Tahoe Rim Trailhead at Mt. Rose Summit
  • Three inches of roadway asphalt will be removed and replaced.
  • Select aging roadside concrete barrier rail will be upgraded on multiple segments of the corridor.
  • Select roadway shoulders will be reconstructed and flattened.

Volvo Roadbuilder
Your local Volvo Construction Equipment dealer
Faris Machinery
Case  - CE
Your local Case Construction Equipment Inc dealer
Century Equipment