Construction

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

First of Two Contracts Awarded for Final Phase of Complete 540

RALEIGH, NC — The North Carolina Department of Transportation (NCDOT) and North Carolina Turnpike Authority (NCTA) have awarded and signed the first of two contracts for the second phase of the Complete 540 Project in southern Wake County.

NCDOT and NCTA awarded the nearly $450 million contract to Flatiron-Fred Smith Company Joint Venture. This contract will construct a 70 mph (posted) six-lane all-electronic toll facility to extend the Triangle Expressway from south of Rock Quarry Road to Interstate 87/U.S. 64/U.S. 264.

The second phase of the Complete 540 Project provides the missing link to complete the 540 loop around the greater Raleigh area. The first phase of the project, scheduled to open to traffic in late spring of 2024, will extend the Triangle Expressway 18 miles from N.C. 55 to I-40. To complete the loop, the second phase of Complete 540 will extend the Triangle Expressway an additional 10 miles from I-40 to existing I-540 at I-87/U.S. 64/U.S. 264 in Knightdale.

The second and final contract for the second phase of Complete 540 is expected to be awarded and signed later this year. Construction for the second phase of Complete 540 could begin as early as 2024, and the project is expected to open to traffic in 2028.

SITECH
Your local Trimble Construction Division dealer
SITECH Mid-South
Wirtgen America Inc
Your local Wirtgen America dealer
Dobbs Equipment
Volvo Roadbuilder
Your local Volvo Construction Equipment dealer
Richmond Machinery & Equipment
Bomag - Roller
Your local Bomag Americas dealer
Linder Industrial Machinery